Asphalt shingle, metal, tile, or flat membrane roofs. Siding (wood, fiber cement, stucco, vinyl). Exterior paint. Soffits and fascia. Gutters and downspouts. Decks and balconies. Railings. Window and door frames in common areas.
Community Associations Institute
Legal Compliance Dashboard — Live Preview
Alabama vs. Washington · 7 requirements tracked
3/7
| Requirement | AL | WA |
|---|---|---|
| RC delivery deadline | 15 days | 10 calendar days |
| Buyer cancellation period | 5 days | 5 business days |
| Lien super-priority | 6 months | 6 months |
Resale Certificate Compliance
8 disclosures required
AL
- Amount of periodic common expense assessment Ala. Code §35-8A-409(a)(1)
- Unpaid assessments or special charges against the unit Ala. Code §35-8A-409(a)(2)
- Most recent regularly prepared balance sheet and income and expense statement Ala. Code §35-8A-409(a)(3)
- Current operating budget Ala. Code §35-8A-409(a)(4)
- Pending lawsuits or judgments against the association Ala. Code §35-8A-409(a)(5)
- Insurance coverage provided for the benefit of unit owners Ala. Code §35-8A-409(a)(6)
- Leasehold terms and renewal provisions (if applicable) Ala. Code §35-8A-409(a)(7)
- Copy of declaration, bylaws, and rules and regulations Ala. Code §35-8A-409(a)
Reserve study standards in Alabama
Statutory requirements, board preparation checklist, the components a professional study covers, and the useful-life ranges that drive thirty-year funding plans. Generic reference. Not a substitute for a study calibrated to a specific association.
Alabama does not currently encode a fixed reserve-study cadence in statute. The discipline still applies. Industry standard across the United States is below.
- Update the component register annually as assets are added, replaced, or retired.
- Commission a professional reserve study every three to five years. Update it when the component register changes materially.
- Maintain a thirty-year capital plan with explicit annual funding contributions tied to the study.
- Keep reserve funds segregated from operating cash. Disclose funding status in the annual budget.
- Document the board-approved funding policy — percent-funded, threshold, or baseline — in board minutes.
CommunityPay maintains a Reserve Funding Status Report (RSR) generator tied to the live ledger. It is a status report, not a substitute for a professional study with on-site inspection.
What a board should have organized before commissioning a reserve study, and what a study delivers back. Use this list to evaluate whether the association is ready, regardless of state.
- Component register Every asset the association is responsible for maintaining — roofs, asphalt, mechanical systems, plumbing risers, elevators, amenities. Freeze a current version before the study.
- Condition assessments Last inspection reports, photographs, observed wear, recent repairs. The analyst calibrates useful-life estimates against this evidence.
- Useful-life and replacement-cost estimates Per component, calibrated to local climate, construction, and use intensity. A study produces these; the board verifies them.
- Thirty-year capital plan When each component reaches end-of-life and what replacement will cost in nominal dollars at that year.
- Funding plan Percent-funded, threshold, or baseline approach with an explicit annual contribution. The board approves; the study models outcomes.
- Current reserve fund balance Separated from operating cash. Ideally in interest-bearing accounts with FDIC coverage on the full balance.
- Annual budget tied to the funding plan Reserve contribution as an explicit budget line, traceable to the study and the funding policy.
- Most recent reserve study Full study, update, or interim review. Author credentials and date of the most recent on-site inspection.
- Insurance schedule Replacement-cost coverage on insured components. Deductibles that may draw against reserves in a loss.
- Board minutes referencing reserve decisions Special assessments, deferred maintenance, funding-policy changes, scope deviations from the study.
Categories most reserve studies cover. The specific components depend on the association. High-rise condos track far more than single-family HOAs. Gated communities track infrastructure that condos never see.
HVAC chillers and cooling towers. Boilers and water heaters. Ventilation. Pumps. Fire suppression and sprinkler systems. Emergency generators. Elevators — cabs, controllers, jacks, and modernizations.
Parking lots: seal coat, overlay, full reconstruction. Concrete sidewalks and curbs. Site lighting. Storm drainage. Retaining walls. Fencing. Entry gates and signage.
Main water lines and risers. Sanitary and storm sewer lines. Backflow preventers. Common-area electrical panels and switchgear. Transformer pads. Distribution.
Pools, spas, and pool equipment. Clubhouse interiors. Fitness rooms. Playgrounds. Tennis and pickleball courts. Mailbox kiosks. Trash enclosures and dumpster pads.
Fire alarm panels. Emergency lighting. Smoke detectors in common areas. Fire-rated doors. Structural fireproofing. Sprinkler heads and inspection-required components.
A mid-size HOA typically tracks thirty to eighty components. A high-rise condo tracks two hundred or more. The categories above are illustrative. A professional reserve study identifies the components a specific association is responsible for.
Typical useful-life ranges for components common in reserve studies. Industry averages, not specific to any state, climate, or association. A professional study calibrates these to local conditions, construction quality, maintenance practice, and use intensity.
| Component | Typical useful life |
|---|---|
| Asphalt shingle roof | 20–25 years |
| Metal roof | 40–50 years |
| Tile or slate roof | 50+ years |
| Flat membrane roof (TPO/EPDM) | 15–25 years |
| Wood siding | 20–30 years |
| Fiber cement siding | 30–50 years |
| Stucco | 50+ years |
| Exterior paint cycle | 7–10 years |
| Gutters and downspouts | 20–30 years |
| Wood deck, pressure-treated | 15–20 years |
| Composite deck | 25–30 years |
| Asphalt parking — seal coat | 3–5 years |
| Asphalt parking — overlay | 12–15 years |
| Asphalt parking — reconstruction | 25–30 years |
| Concrete sidewalks and curbs | 30–50 years |
| Site lighting (poles, fixtures) | 20–30 years |
| Wood fencing | 15–25 years |
| Pool plaster | 10–15 years |
| Pool pump and filter | 7–10 years |
| HVAC rooftop unit | 15–20 years |
| Boiler | 25–30 years |
| Commercial water heater | 10–15 years |
| Fire alarm panel | 20–25 years |
| Elevator cab finishes | 15–20 years |
| Elevator modernization | 25–30 years |
| Carpet, clubhouse | 7–10 years |
| Playground equipment | 10–15 years |
Ranges synthesized from common professional reserve-study references and U.S. building-component literature. Verify against a study performed by a credentialed reserve specialist (RS, PRA, or equivalent) before relying on any figure for funding decisions.
- Reserve Health Check → Free. Inputs reserve balance, annual contribution, building age, and components; returns a grade with the math shown. No signup required to view results.
Meeting requirements in Alabama
Statutory floors for owner and board meetings — notice periods, delivery rules, quorum, voting, written consent, and record retention. Generic reference. Specific bylaws or declarations may impose tighter requirements; statutes set the minimum.
Alabama statute does not currently encode specific board or owner meeting notice periods in the corpus. The discipline still applies. Industry standard is below.
- Provide at least 10 days advance notice for board meetings.
- Provide 14–30 days advance notice for annual or special owner meetings.
- Hold at least one annual meeting of the membership each year.
- Keep all board meetings open to owners in good standing; reserve executive session for narrow purposes.
- Define a quorum threshold in the bylaws and apply it consistently.
CommunityPay maintains a Board Meeting Packet generator that produces a state-aware agenda, draft minutes template, and compliance checklist for the board pack.
How meeting notice must be delivered, what it must contain, and what defects invalidate the notice. Statutes vary in mechanics; the principles are consistent.
- Delivery method First-class mail or hand-delivery to the address on file with the association is the universal default. Most states permit electronic delivery only with the owner's written consent. A posted notice on a community bulletin board is not, by itself, sufficient.
- Address on file The association is entitled to rely on the address each owner has provided. The owner bears the burden of keeping it current. The board must maintain a registered address list.
- Required content Date, time, location (or remote-access link), and an agenda. Material to be voted on — budget, special assessments, rule changes — must be identified specifically. "Other business" is not a substitute for an item.
- Notice period start The notice period typically runs from the date of mailing or hand-delivery, not the date of receipt. Some states count both the notice date and the meeting date; others exclude one or both. Confirm the rule.
- Remote participation When the association offers remote attendance, the notice must include the access information and any limitations (e.g., audio-only, no chat). Recording rules vary by state.
- Defective notice consequences Material defects invalidate actions taken at the meeting. Minor defects (typo in location, slightly late mailing) may be cured by attendance and waiver. Document the cure in the minutes.
- Emergency notice Statutes typically permit shortened notice for genuine emergencies (imminent physical harm, immediate financial loss). The board must document the emergency basis in the minutes.
Quorum sets the floor for a valid meeting. Voting mechanics — proxies, ballots, written consent — determine how votes are counted once the quorum is established.
Defined in the declaration or bylaws. When silent, statutory defaults apply — typically 20–25% of allocated interests for owner meetings. Quorum is measured at the start; once established it persists even if attendance drops below the threshold.
Most states permit proxies for owner meetings. The proxy must be written, dated, and signed; many states require revocation rights and an explicit scope (general or limited). Proxies do not extend to board meetings — directors must vote in person or by permitted remote means.
Action without a meeting requires unanimous written consent in most jurisdictions, though some states permit a lower threshold for narrow categories (uncontested matters, ratification). Document the consent in the corporate records, indexed to the action taken.
Secret-ballot procedures, double-envelope requirements, and inspector-of-elections rules apply in states with comprehensive election statutes. Director elections, recall votes, and assessment increases above a statutory threshold typically require secret-ballot procedure.
Available only when explicitly authorized by the declaration or bylaws. Otherwise straight voting applies — each membership casts one vote per open seat per candidate, with no concentration permitted.
Voting rights may be suspended for delinquent accounts in some jurisdictions. Suspension typically requires due-process notice and an opportunity to cure. Statutes vary; the bylaws must align.
Minutes are the corporate record of the meeting. Statutes in every state require associations to maintain meeting minutes and make them available to owners on request. Retention periods and access rules vary.
- What minutes must contain Date, time, location. Directors and officers present. Quorum determination. Motions made, seconded, and the vote count. Substantive board actions and adopted resolutions. Executive-session minutes kept separately; the open-session minutes record only that a closed session occurred.
- Retention period Statutes vary; common floors are seven years for financial records and the life of the association for governance records. Permanent retention is the safer practice. Reserve studies, declarations, amendments, and assessments — permanent.
- Owner inspection rights Owners have a statutory right to inspect minutes and association records on written request. The association may charge reasonable copy fees and require inspection during normal business hours at a designated location.
- Approval process Draft minutes are circulated to the board, corrected, and approved at the next regular meeting. Approved minutes become the official record. Corrections after approval require a noted amendment, not silent edits.
- Permanent records Declaration, bylaws, articles of incorporation, rule books, amendments, and the minute book are permanent records. The association cannot dispose of them on any retention schedule.
- Resale disclosure Recent board and owner meeting minutes are typically required attachments to a resale certificate. The standard window is the last 12 months; some statutes extend to 24 months for amendments.
- Executive session Closed-session minutes record matters discussed but typically remain confidential from the general membership. Specific votes taken in closed session may need to be reported in the open-session minutes.
- Board Meeting Packet Generator → Free. State-aware agenda, minutes template, and compliance checklist exported to a PDF for the board pack. No signup required.
Insurance & risk requirements in Alabama
Statutory floors plus the Fannie Mae 1076 and Freddie Mac 476 condo questionnaire fields lenders verify before closing. Generic reference. Specific declarations or bylaws may impose tighter requirements; statutes set the minimum.
- Hazard / property coverage
-
100%
of replacement cost value, project improvements + common elements + residential structures
Fannie Mae B7-3-03 - Comprehensive general liability
-
$1000000
minimum per single occurrence, bodily injury and property damage on common elements
Fannie Mae B7-4-01
- Replacement cost basis — policy must pay to rebuild without depreciation deduction.
- Agreed-amount endorsement — waives the coinsurance penalty when coverage is set to a stated replacement cost.
- Inflation guard endorsement — annual escalation to keep coverage at current rebuild cost.
- Building ordinance or law endorsement — covers the cost gap when current building codes require upgrades during a rebuild.
- Fidelity / crime bond minimum
-
3
months of aggregate assessments on all units
Fannie Mae B7-4-02
The fidelity / crime policy protects association funds from dishonest or fraudulent acts by anyone handling or responsible for those funds — directors, officers, employees, and the management agent. The HOA or co-op corporation must be the named insured, with premiums paid as a common expense.
- Named covered parties — board, officers, employees, and the management company (when one is engaged).
- Computation basis — months of assessments plus reserve balance, or a percentage of the operating budget, depending on the governing statute.
- Annual renewal — coverage lapses are a common audit finding and trigger lender disqualification.
- Deductible cap
-
5%
maximum of master policy coverage amount, aggregated across per-peril deductibles
Fannie Mae B7-3-03
Higher deductibles disqualify the project from conforming mortgage originations on every unit. State statutes sometimes codify a tighter cap or require board approval before deductible changes.
Flood insurance is required when any portion of the project sits inside a FEMA-designated Special Flood Hazard Area (SFHA). Coverage must equal the lesser of the building replacement cost or the National Flood Insurance Program (NFIP) maximum, with the balance covered by an excess flood policy.
Beyond the master property policy, lenders require several distinct coverages and endorsements. Each addresses a specific risk category the master policy alone does not handle.
- Directors & officers (D&O) liability — defends board members against claims arising from governance decisions. Often required by lenders even when not codified by statute.
- Umbrella / excess liability — extends primary liability limits, typically by $1M to $5M, to cover catastrophic claims.
- Workers’ compensation — required when the association directly employs maintenance or management staff.
- Earthquake / windstorm — peril-specific policies in seismic and coastal zones. Lender requirement depends on territory.
- Environmental / pollution — applies when the association operates pools, fuel storage, or other regulated facilities.
Specific statutory provisions seeded for Alabama:
- Policies must name unit owners as insured persons for common element liability, waive subrogation against unit owners, and provide primary coverage — Ala. Code §35-8A-313
- Association must maintain property insurance on common elements from first unit conveyance to non-declarant, covering not less than the greater of 80 percent of actual cash value or sufficient to avoid co-insurance penalties (excluding land, excavation, and foundations) — Ala. Code §35-8A-313
- For buildings with horizontal boundaries, insurance must include units but need not cover owner-installed improvements — Ala. Code §35-8A-313
- Board determines liability insurance amount — Ala. Code §35-8A-313
Statutory Obligations — Alabama
81 obligations across 7 categories
AL
-
Notice must state place, day, and hour; for special meetings, the purpose(s)
Notice must state the place (if any), day, and hour of the meeting; for a special meeting, the purpose or purposes for which it is called.Ala. Code §10A-3-2.03
-
Notice must be delivered not less than 10 nor more than 60 days before the meeting
Notice must be delivered not less than 10 nor more than 60 days before the date of the meeting, unless the governing documents provide otherwise.Ala. Code §10A-3-2.03
-
Notice is given by or at the direction of the president, secretary, or persons calling the meeting
Notice is delivered by or at the direction of the president, the secretary, or the officers or persons calling the meeting, to each member entitled to vote at the meeting.Ala. Code §10A-3-2.03
-
AL HOA Meeting Notice Maximum (Nonprofit Corp Law): 60 days
Not less than 10 nor more than 60 days before the date of the meetingAla. Code §10A-3-2.03
-
Notice must describe the means of remote communication where the board has authorized it
If the board of directors has authorized participation by means of remote communication pursuant to Section 10A-3A-2.02(d), (e), and (f), the notice to the members must describe the means of remote communication to be used.Ala. Code §10A-3-2.03
-
AL HOA Meeting Notice Minimum (Nonprofit Corp Law): 10 days
Not less than 10 nor more than 60 days before the date of the meetingAla. Code §10A-3-2.03
-
Board powers, to the extent authorized by the declaration: (1) suspend member's right to use association-provided facilities or services for nonpayment (but may not deny access to the member's lot); (2) assess reasonable penalties for violations after notice and hearing with c...
Board powers, to the extent authorized by the declaration: (1) suspend member's right to use association-provided facilities or services for nonpayment (but may not deny access to the member's lot); (2) assess reasonable penalties for violations after notice and hearing with counsel.Ala. Code §35-20-11
-
Board may take direct action against tenants for governing document violations
Board may take direct action against tenants for governing document violations.Ala. Code §35-20-11
-
Before recording a lien statement, association must give 30 days' written notice by certified mail
Before recording a lien statement, association must give 30 days' written notice by certified mail.Ala. Code §35-20-12
-
Does NOT apply to commercial/industrial/nonresidential developments, condominiums regulated under Chapter 8 or 8A, real estate cooperatives, time-shares, or campgrounds
Does NOT apply to commercial/industrial/nonresidential developments, condominiums regulated under Chapter 8 or 8A, real estate cooperatives, time-shares, or campgrounds.Ala. Code §35-20-3
-
Applies to all residential developments with a recorded declaration providing for a homeowners' association, recorded on or after January 1, 2016
Applies to all residential developments with a recorded declaration providing for a homeowners' association, recorded on or after January 1, 2016.Ala. Code §35-20-3
-
Pre-2016 associations may elect governance under this chapter by a majority vote of members
Pre-2016 associations may elect governance under this chapter by a majority vote of members.Ala. Code §35-20-3
-
HOAs created on or after January 1, 2016 must be organized as nonprofit corporations under Chapter 3 of Title 10A
HOAs created on or after January 1, 2016 must be organized as nonprofit corporations under Chapter 3 of Title 10A.Ala. Code §35-20-5
-
Organizational documents must provide for: member communication methods, meeting conduct rules, complete financial records accessible to members, common area use and maintenance rules with violation penalties, assessment payment statements, and annual budget submission to members
Organizational documents must provide for: member communication methods, meeting conduct rules, complete financial records accessible to members, common area use and maintenance rules with violation penalties, assessment payment statements, and annual budget submission to members.Ala. Code §35-20-5
-
Secretary of State maintains a searchable public database
Secretary of State maintains a searchable public database.Ala. Code §35-20-5
-
Must file articles of incorporation, bylaws, and CC&Rs with the judge of probate (transmitted to Secretary of State)
Must file articles of incorporation, bylaws, and CC&Rs with the judge of probate (transmitted to Secretary of State).Ala. Code §35-20-5
-
Unlike the condo act (§35-8A-303), this section does NOT prescribe specific transition percentages, timelines, or mandatory turnover requirements
Unlike the condo act (§35-8A-303), this section does NOT prescribe specific transition percentages, timelines, or mandatory turnover requirements.Ala. Code §35-20-7
-
The declaration MAY provide for a period of declarant control over board elections and a right to alter the declaration
The declaration MAY provide for a period of declarant control over board elections and a right to alter the declaration.Ala. Code §35-20-7
-
Developer transition is governed entirely by the governing documents, not by statute
Developer transition is governed entirely by the governing documents, not by statute.Ala. Code §35-20-7
-
PERMISSIVE, not mandatory
PERMISSIVE, not mandatory.Ala. Code §35-20-7
-
Notice must state the purpose, provide for nominations with consent of at least 10 percent of membership (unless otherwise specified), and list existing directors and those who may continue to serve
Notice must state the purpose, provide for nominations with consent of at least 10 percent of membership (unless otherwise specified), and list existing directors and those who may continue to serve.Ala. Code §35-20-9
-
Within 120 days of members gaining the right to elect a board, the declarant must give written notice of a special meeting for board elections, per nonprofit corporation notice requirements (§10A-3-2.03)
Within 120 days of members gaining the right to elect a board, the declarant must give written notice of a special meeting for board elections, per nonprofit corporation notice requirements (§10A-3-2.03).Ala. Code §35-20-9
-
Condominiums with four or fewer units and no development rights may elect to be governed by prior law instead
Condominiums with four or fewer units and no development rights may elect to be governed by prior law instead.Ala. Code §35-8A-102
-
Applies to all condominiums created in Alabama after January 1, 1991
Applies to all condominiums created in Alabama after January 1, 1991.Ala. Code §35-8A-102
-
Enumerates 15 powers of the unit owners' association including: adopting bylaws and rules; adopting budgets and collecting assessments (including for reserves); hiring and discharging agents; instituting litigation; making contracts; regulating common elements; granting easeme...
Enumerates 15 powers of the unit owners' association including: adopting bylaws and rules; adopting budgets and collecting assessments (including for reserves); hiring and discharging agents; instituting litigation; making contracts; regulating common elements; granting easements; imposing late fees and fines; imposing reasonable charges for preparation of resale certificates and amendments; maintaining D&O liability insurance; and assigning future assessment income.Ala. Code §35-8A-302
-
Declaration may not impose more restrictive limitations on dealings with the declarant than with other persons
Declaration may not impose more restrictive limitations on dealings with the declarant than with other persons.Ala. Code §35-8A-302
-
Declarant control terminates at the earliest of: (i) 60 days after conveyance of 75% of units to non-declarant owners; (ii) 2 years after all declarants cease offering units for sale in the ordinary course of business; (iii) 2 years after any development right to add new units...
Declarant control terminates at the earliest of: (i) 60 days after conveyance of 75% of units to non-declarant owners; (ii) 2 years after all declarants cease offering units for sale in the ordinary course of business; (iii) 2 years after any development right to add new units was last exercised.Ala. Code §35-8A-303
-
Establishes progressive developer transition for condominium associations
Establishes progressive developer transition for condominium associations.Ala. Code §35-8A-303
-
Upon termination of declarant control, owners elect a board of at least three members
Upon termination of declarant control, owners elect a board of at least three members.Ala. Code §35-8A-303
-
Progressive board representation: within 90 days of 25% conveyance, at least 25% of board must be elected by non-declarant owners; within 90 days of 50% conveyance, at least 33-1/3% must be owner-elected
Progressive board representation: within 90 days of 25% conveyance, at least 25% of board must be elected by non-declarant owners; within 90 days of 50% conveyance, at least 33-1/3% must be owner-elected.Ala. Code §35-8A-303
-
AL Condo Developer Full Transition Trigger
60 days after conveyance of 75 percent of the units which may be created to unit owners other than a declarantAla. Code §35-8A-303(d)
-
AL Condo Second Owner Board Representation Trigger
Not less than 33 1/3 percent of the members of the board must be elected by unit owners other than the declarantAla. Code §35-8A-303(e)
-
AL Condo First Owner Board Representation Trigger
Not less than 25 percent of the members of the board must be elected by unit owners other than the declarantAla. Code §35-8A-303(e)
-
Bylaws must address: number of board members and officer titles; election of president, treasurer, secretary; board member qualifications, authority, duties, tenure, selection, removal, and vacancy procedures; delegation of board or officer powers; which officers can prepare a...
Bylaws must address: number of board members and officer titles; election of president, treasurer, secretary; board member qualifications, authority, duties, tenure, selection, removal, and vacancy procedures; delegation of board or officer powers; which officers can prepare and record declaration amendments; and amendment method (required percentage may not exceed two-thirds).Ala. Code §35-8A-306
-
AL Condo Meeting Notice Minimum: 10 days
Not less than 10 nor more than 60 days in advance of any meetingAla. Code §35-8A-308
-
mail to the mailing address of each unit or other designated address
mail to the mailing address of each unit or other designated address.Ala. Code §35-8A-308
-
Notice must include time, place, and agenda items including the general nature of any proposed amendment, budget changes, and proposals to remove officers or board members
Notice must include time, place, and agenda items including the general nature of any proposed amendment, budget changes, and proposals to remove officers or board members.Ala. Code §35-8A-308
-
AL Condo Meeting Notice Maximum: 60 days
Not less than 10 nor more than 60 days in advance of any meetingAla. Code §35-8A-308
-
AL Condo Special Meeting Request Threshold
20 percent, or any lower percentage specified in the bylaws, of the votesAla. Code §35-8A-308
-
Requires at least one annual meeting
Requires at least one annual meeting.Ala. Code §35-8A-308
-
Notice of 10 to 60 days in advance, hand-delivered or sent prepaid by U.S
Notice of 10 to 60 days in advance, hand-delivered or sent prepaid by U.S.Ala. Code §35-8A-308
-
The association may assess expenses caused by individual owner misconduct exclusively against that owner's unit after notice and hearing opportunity
The association may assess expenses caused by individual owner misconduct exclusively against that owner's unit after notice and hearing opportunity.Ala. Code §35-8A-315
-
Required disclosures include: current and pending assessments, common areas owned or funded, current operating budget and reserve funds, insurance coverage, outstanding loans and collateral, current officer contact information, current CC&Rs, transfer or initiation fees due at...
Required disclosures include: current and pending assessments, common areas owned or funded, current operating budget and reserve funds, insurance coverage, outstanding loans and collateral, current officer contact information, current CC&Rs, transfer or initiation fees due at closing, complete listing of common areas, and pending lawsuits, judgments, liens, or arbitration.Ala. Code §35-20-13
-
Six-month super-priority: the lien is prior to first mortgages to the extent of common expense assessments that would have accrued during the six months immediately preceding the association's enforcement action or mortgage foreclosure (excluding attorney fees and costs)
Six-month super-priority: the lien is prior to first mortgages to the extent of common expense assessments that would have accrued during the six months immediately preceding the association's enforcement action or mortgage foreclosure (excluding attorney fees and costs).Ala. Code §35-8A-316
-
Lien arises on the date the assessment is due
Lien arises on the date the assessment is due.Ala. Code §35-20-12
-
Priority is AFTER state and county ad valorem taxes, municipal improvement assessments, UCC fixture filings, mortgages, and deeds of trust — meaning there is NO super-priority over first mortgages (unlike the condo act)
Priority is AFTER state and county ad valorem taxes, municipal improvement assessments, UCC fixture filings, mortgages, and deeds of trust — meaning there is NO super-priority over first mortgages (unlike the condo act).Ala. Code §35-20-12
-
AL HOA Judicial Foreclosure Required
The court in which the action is pending may enforce the lien by a sale of the property after the giving of noticeAla. Code §35-20-12
-
AL HOA Lien Recording Deadline: 12 months
Within 12 months from the date any assessment becomes dueAla. Code §35-20-12
-
AL HOA Pre-Lien Recording Notice Period: 30 days
At least 30 days prior to recording a statement of lienAla. Code §35-20-12
-
Past-due assessments accrue interest at the rate established by the association, not exceeding 18 percent per year
Past-due assessments accrue interest at the rate established by the association, not exceeding 18 percent per year.Ala. Code §35-8A-315
-
Assessments must be made at least annually based on an annually adopted budget
Assessments must be made at least annually based on an annually adopted budget.Ala. Code §35-8A-315
-
Expenses benefiting fewer than all units may be assessed only to the benefited units
Expenses benefiting fewer than all units may be assessed only to the benefited units.Ala. Code §35-8A-315
-
AL Condo Maximum Interest Rate on Delinquent Assessments
Interest at the rate established by the association not exceeding 18 percent per yearAla. Code §35-8A-315(b)
-
Association has a lien on each unit for assessments, special assessments, fines, and charges from the date they become due
Association has a lien on each unit for assessments, special assessments, fines, and charges from the date they become due.Ala. Code §35-8A-316
-
AL Condo Assessment Lien Super-Priority Period: 6 months
Common expense assessments based on the periodic budget which would have become due in the absence of acceleration during the six months immediately precedingAla. Code §35-8A-316(b)
-
AL Condo Assessment Lien Enforcement Deadline: 3 years
Unless proceedings to enforce the lien are instituted within three years after the full amount of the assessments becomes dueAla. Code §35-8A-316(e)
-
AL Condo Assessment Statement Response Deadline: 10 business_days
The association must respond within 10 business daysAla. Code §35-8A-316(h)
-
For buildings with horizontal boundaries, insurance must include units but need not cover owner-installed improvements
For buildings with horizontal boundaries, insurance must include units but need not cover owner-installed improvements.Ala. Code §35-8A-313
-
Board determines liability insurance amount
Board determines liability insurance amount.Ala. Code §35-8A-313
-
Association must maintain property insurance on common elements from first unit conveyance to non-declarant, covering not less than the greater of 80 percent of actual cash value or sufficient to avoid co-insurance penalties (excluding land, excavation, and foundations)
Association must maintain property insurance on common elements from first unit conveyance to non-declarant, covering not less than the greater of 80 percent of actual cash value or sufficient to avoid co-insurance penalties (excluding land, excavation, and foundations).Ala. Code §35-8A-313
-
Policies must name unit owners as insured persons for common element liability, waive subrogation against unit owners, and provide primary coverage
Policies must name unit owners as insured persons for common element liability, waive subrogation against unit owners, and provide primary coverage.Ala. Code §35-8A-313
-
This serves as the de facto disclosure mechanism for HOA lot sales — Alabama has NO separate resale certificate requirement for non-condo HOAs
This serves as the de facto disclosure mechanism for HOA lot sales — Alabama has NO separate resale certificate requirement for non-condo HOAs.Ala. Code §35-20-13
-
Article 4 (purchaser protection) applies to all units subject to the act
Article 4 (purchaser protection) applies to all units subject to the act.Ala. Code §35-8A-401
-
Neither an offering statement nor a resale certificate is required for these exempt transactions
Neither an offering statement nor a resale certificate is required for these exempt transactions.Ala. Code §35-8A-401
-
Owner must deliver within 15 days of request
Owner must deliver within 15 days of request.Ala. Code §35-8A-409
-
Association must furnish the certificate to the unit owner within 10 days of owner's request
Association must furnish the certificate to the unit owner within 10 days of owner's request.Ala. Code §35-8A-409
-
Purchaser must request within 14 days of signing
Purchaser must request within 14 days of signing.Ala. Code §35-8A-409
-
Requires unit owners to furnish purchasers with the declaration, bylaws, rules, and a certificate containing assessment amounts, unpaid balances, budget, financial statements, pending litigation, insurance coverage, and leasehold terms
Requires unit owners to furnish purchasers with the declaration, bylaws, rules, and a certificate containing assessment amounts, unpaid balances, budget, financial statements, pending litigation, insurance coverage, and leasehold terms.Ala. Code §35-8A-409
-
AL Condo Resale Certificate — Owner Delivery Deadline: 15 days
Before the conveyance and in any event within 15 days of receipt of the written requestAla. Code §35-8A-409(a)
-
AL Condo Resale Certificate — Association Response Deadline: 10 days
Within 10 days after a request by a unit ownerAla. Code §35-8A-409(b)
-
AL Condo Buyer Cancellation Period After Certificate Receipt: 5 days
Voidable by the purchaser until the requested information has been provided and for five days thereafter or until conveyance, whichever first occursAla. Code §35-8A-409(c)
-
AL HOA Records Request Response Deadline: 30 days
Within 30 days of the date of the requestAla. Code §35-20-13
-
Upon written request by a member or potential purchaser (and upon payment of reasonable costs), the association must provide or direct the requestor to records within 30 days
Upon written request by a member or potential purchaser (and upon payment of reasonable costs), the association must provide or direct the requestor to records within 30 days.Ala. Code §35-20-13
-
Requires the association to maintain detailed financial records, meeting minutes, and other records
Requires the association to maintain detailed financial records, meeting minutes, and other records.Ala. Code §35-8A-318
-
Records must be made available for examination and copying by unit owners and their authorized agents
Records must be made available for examination and copying by unit owners and their authorized agents.Ala. Code §35-8A-318
-
Penalties assessed become assessments under §35-20-12 (lien provisions)
Penalties assessed become assessments under §35-20-12 (lien provisions).Ala. Code §35-20-11
-
Lien must be recorded within 12 months of the assessment becoming due, as a verified statement in the probate judge's office
Lien must be recorded within 12 months of the assessment becoming due, as a verified statement in the probate judge's office.Ala. Code §35-20-12
-
Specified sections (including assessment liens §35-8A-316 and resales §35-8A-409) apply retroactively to pre-1991 condominiums for events and circumstances occurring after January 1, 1991
Specified sections (including assessment liens §35-8A-316 and resales §35-8A-409) apply retroactively to pre-1991 condominiums for events and circumstances occurring after January 1, 1991.Ala. Code §35-8A-102
-
Foreclosure "in like manner as a mortgage on real estate." Enforcement must be instituted within three years of the full assessment becoming due
Foreclosure "in like manner as a mortgage on real estate." Enforcement must be instituted within three years of the full assessment becoming due.Ala. Code §35-8A-316
-
Lien is prior to all liens except those recorded before the declaration, first mortgages recorded before delinquency, and government tax liens
Lien is prior to all liens except those recorded before the declaration, first mortgages recorded before delinquency, and government tax liens.Ala. Code §35-8A-316
-
Exceptions: dispositions to persons in the business of selling real estate (with transferred disclosure responsibility), contracts cancellable at any time without penalty, and time-share interests
Exceptions: dispositions to persons in the business of selling real estate (with transferred disclosure responsibility), contracts cancellable at any time without penalty, and time-share interests.Ala. Code §35-8A-401
Risk Profile — CARI Score Preview
5 weighted components · Verified score requires consent
Preview
Compliance Calendar — Next 12 Months
1 deadline
Records This Community Should Have — Alabama
2 record categories required by statute
-
Tax returns
Federal and state association tax returns.Retention: 7 yearsIRC §6501 + state retention norms
-
Tax returns
Federal association tax returns.Retention: 7 yearsIRC §6501
Registration Details
Unclassified Entity · Est. 1979 · Active
Area HOA Fees
Jefferson County median $312/mo
Natural Hazard Exposure
Jefferson County
Relatively High
Applicable Laws
19 Alabama statutes
Claim Community Associations Institute
If you're on the board, manage this community, own a unit, or live here as a resident, claim this listing and we'll work with you to bring Community Associations Institute onto CommunityPay — at no cost until you're ready to roll it out.
Claim this unclassified entityInterested in automated dues and accounting for Community Associations Institute?
Get in touchClaim Community Associations Institute
Board, manager, or owner? Claim this listing and bring Community Associations Institute onto CommunityPay — at no cost until you're ready to roll it out.
Claim this unclassified entityCommunity Associations Institute has not claimed this record. CommunityPay has no verified relationship with the association.
Watch the setup guide- Online dues Residents pay by bank transfer. Posts to a double-entry ledger automatically.
- Resale certificates in seconds Generated from live ledger data, statute-compliant for Alabama.
- Auditable ledger Every financial decision logged and traceable. Board turnover doesn't erase memory.
Books in a spreadsheet?
We set up your association's books — chart of accounts, opening balances tied to bank statements, every owner ledger — and reconcile the first month. $1,500 once. $100 a month after.
How it worksBuying, selling, or lending on a unit here?
Community Associations Institute is not on CommunityPay, so CommunityPay does not issue its resale certificate or answer lender questionnaires for it. Order those from the association or its manager.
On the board for Community Associations Institute? Set it up on CommunityPay and certificates come from the ledger in seconds.
Set up your community
Professional accounting, online payments, and compliance tools built for unclassified entitys.
Get startedWant to pay dues online?
Share this page with your board. When they set up CommunityPay, you can pay dues by bank transfer.
Share with your board